FUTURE LAB
01 Planning period
Consultation, feasibility analysis, andprojeet concept design.
02 Construction period
Scheme design, equipment selection, secondary optimization design, processing and production, procurement, construetion, commissioning/operation, and management.
03 Operation period
System maintenanee, equipment maintenanee, qualification consultation, and personnel training.
04 Upgrade period
Evaluation of renovationexpansionprojects; Preliminaryconeeptual design for renovation/expansion; EPC
Air conditioning mechanieal system
· Equipment cold andheat source system
· Air conditioning syslem
· Air conditioning waler system
· Pure waler system
· Water supply anddrainage system
Internal decoration system
· Modular ceiling system
· Modular flooring system
· Modular compartment system
· Experimental Furiture system
Controlled environment
· Process waste gastreatment system
· Process wastewateltreatment system
· Hazardous Chemicals Management system
· Central dust collection system
· Gas supply system
Power and Management System
· Municipal power distribution system
· UPS distribution system
· BMS system
· EMS system
· Lighting/socket system
· Lightning protection/anti-static system
· Automatic control system
Fire and Safety Management System
· Fire and smoke exhaust system
· Fire hydrant system
· Spray system
· Sprinkler or gas fire extinguishing system
· Fire alarm system
· Access control system
· Video surveillance system
· Weak current and intelligent system
Anti vibration andnoise reductionsystem
· Anti vibration system
· Anti vibration system
· Sound insulation system
· Active noise reduction system